|
 |
OREGON WORK GROUP JULY 07
OREGON WORK GROUP, LEADING WORSHIP SERVICE |
|
JULY 07 |
PARK BEFORE WORK STARTED JULY 07 |
|
LOTS OF GRASS AND WEEDS AND EQUIPMENT NEEDS PAINTING |
GROUP SCRAPING, SANDING AND PRIMING EQUIPMENT |
|
JULY 07 |
VACATION BIBLE SCHOOL AT STAR OF BETH. CHURCH |
|
JULY 07 |
MEXICAN AND AMERICAN YOUTH AFTER VOLLEYBALL GAME |
|
JULY 07 |
PARK OPENED, MEXICAN CHILDREN HAVING FUN |
|
JULY 07 |
USING THE NEW SLIDES AND HOUSE THAT WERE MADE |
|
JULY 07 |
|
MY HOME, WORKER VALENZUELA , ON LEFT, HELPED IN BUILDING SINCE 1993 |
|
CAN YOU TELL I LOVE PLANTS, LOOK AT THIS BEAUTIFUL PATIO THE LORD GAVE ME SEP. 04 |
|
WELDING PATIO ROOF AUG. 04 |
|
PATIO COVER GOING UP JULY 04 |
REGIONAL TRAINING CENTER 2001 |
|
JIM SPENT 9 YEARS BUILDING THIS FOR OUR LORDS WORK |
|
Star of Bethlehem Church in 03 This is the last church that Jim started |
Jim built 21 churches and was working on the Star of Bethlehem Church in Autlán, Jalisco when he was called home to be
with the Lord.
The cost of each church ranges from $4,000.00 to $6,000.00 with the exception of the church above. Each church
was designed and built by Jim and many groups from the United States.
I will continue to put in pictures of the buildings he built as soon as I can find them.
|
THIS IS THE SECOND CHURCH THAT JIM BUILT IN THE TIJUANA AREA. WITH THE HELP OF A GROUP FROM THE U.S |
|
JIM PUT A ROOF ON THIS SMALL CHURCH IN GUADALAJARA, JALISCO |
|
 |
Enter first column content here
|
Jim in the 2nd Church in Tehuantepec, Oaxaca that he helped to build |
|
 |
|
|
 |
Enter second column content here
|
 |
|
|
|
|
JIM HELPED BUILD THIS PATIO AT AN ORPHANAGE IN SAN LUIS, SONORA |
|
JIM REBUILT A WIDOWS HOME IN TIJUANA, B.C. |
|
1ST TRUCK AND TRAILER ON THE NEW LOTS FOR THE RTC |
Enter supporting content here
|
|
|
 |